![]()
![]()
![]()
![]()
![]()
A high reach demolition boom adds a middle arm to the two-section demolition boom, increasing the working safety distance. It typically equipped with a breaker hammer or a hydraulic shear for high building demolition projects.
High reach deomolition armwill boring after welding , the accuracy is high precision as the original arm to prolong it service life.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
ZHONGHE triple quality control system
The first system is the technical design drawing review mechanism,
The second system is the semi-finished product review mechanism,
(each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether
the installation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure
that is qualified before shipping.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Bubble bag packaging for most products, Wooden case for little products, like buckets
![]()
![]()